Shipping policy
PACKAGING AND DELIVERY
(a) The delivery date set out in an acknowledgement of order is an estimate only and the Seller shall be under no Liability for any delay or the consequences of any delay. Time is not of the essence in relation to delivery dates.
(b) The Seller will notify the Purchaser as soon as reasonably practicable of the actual delivery date for the Products and all relevant unloading requirements. If delivery is earlier than estimated the Purchaser shall accept delivery as soon as the Seller is able to deliver.
(c) The Purchaser shall unload the Products on arrival at the Purchaser’s premises, position the Products on a suitably prepared foundation and arrange for all necessary utilities to be connected to the Products.
(d) The extent of packing and/or protection necessary will be at the Seller’s discretion. The cost of such packaging and also delivery shall be included in the price of the Products. Any other packing requirements stipulated by the Purchaser will be at the Purchaser’s risk and cost.
(e) The Seller shall be under no liability whatsoever for any loss or damage caused or injury suffered as a result of the unloading of the Products unless the Seller shall have undertaken such unloading.
Damage in Transit:
Notification of any such damage must be forwarded to us and carriers within three days of receipt of goods.
